Site Index
Contact us / About Us
Bay & Watershed Info
Old CCMP|New CCMP
Links
Funding
Laws and Regulations
NEP Information
Reference
Status & Trends
Solutions
Take Action
Violations, Reporting
Weather and Tides
1994 Nitrogen Management Correspondence
MEMORANDUMTO:Ed Eichner, Cape Cod Commission
FROM:Joe Costa, Buzzards Bay NEP
DATE:September 29, 1994
RE:Waquoit Bay N calculations and appropriate management strategies
As you know, the Buzzards Bay NEP has been involved with nitrogen management issues in
Waquoit Bay for the past four years. Your correspondence to me last week has prompted me to
address some major issues and difficulties in developing a nitrogen management strategy for the
Waquoit Bay drainage basin, and to propose one possible management strategy for the Cape Cod
Commission and the surrounding municipalities to follow.
Application and Appropriateness of BBP tiered limits
The differences in the Buzzards Bay NEP target nitrogen loadings for Waquoit Bay sent to the
Cape Cod Commission in 1992 and the calculations you sent me last week can be easily explained
as follows:
1)The volume of Waquoit Bay used in your calculation is incorrect.
You indicated that Rocky Geyer stated that the volume of the bay is 230,000 m3, but you note
the area of the bay (not including the side ponds like Jehu and Hamblin) is 389 hectares.
Since 1 hectare = 10,000 m2, this is 3,890,000 m2. If the bay has an average depth of 1 m at
half tide, this would equal 3,890,000 m3. I think the 230,000 m3 figure Rocky mentioned was
really the tidal prism and not the bay volume.
Because I considered the entire watershed, I considered the volume of the Waquoit Bay-Eel
Pond-Jehu-Hamblin-Sage Pond complex in my 1992 calculations. In my spreadsheet I have
listed the area of these surface waters as 6.56 km2, and I used 6,040,000 as the volume at
half-tide (volume at MLW+ 1/2 tidal prism) for all these embayments (I don't recall if this
is a guesstimate or based on some WBNERR report).
2)We used different flushing times for the bay.
I used 5.0 days which was based on some discussions I had with Steve Aubrey about the
flushing time in the upper third of the estuary-complex. Geyer came up with a flushing time
of 2.7 days, which as I recall was for just Waquoit Bay, and represented the average for the
whole bay not just the upper bay. Use of 5 days puts the calculation into the area-based
loading scale, 2.7 days requires use of the Vollenweider calculation.
3)Different standard should be used.
In your calculation you used a water quality standard for SA waters. Because of Waquoit
Bay's ACEC designation and because it contains (or formerly did) valuable resources and
habitat, the ORW designation should be adopted.
Using the ORW designation, 5 day flushing time, and 6.56 km2 area, the N loading limit for the
entire estuary complex should be 31,000 kg/yr. Using the ORW designation, 2.7 day flushing time
figure you mention (I think much too low for upper third of entire complex), and 6,040,000 m3
volume, and 100 mg/m3/Vr limit, then the N loading limit for the entire estuary complex would be
a remarkably high limit of 82,000 kg/yr. But there are several problems here, and Waquoit Bay challenges the appropriateness of applying
the tiered limits recommended in the Buzzards Bay CCMP. (Actually the tiered limits should not
be adopted for embayments already impacted, and I discuss that issue below.) First of all, it may not be appropriate to develop a single nitrogen management target for the entire
Waquoit Bay estuary complex. Clearly Jehu Pond and Hamblin Pond have not seen the kind of algal
proliferation and eelgrass bed collapse as observed in Eel Pond and Waquoit Bay, which also receive
most of the nitrogen inputs. The Sage Lot drainage subbasin has little potential for new development
because most if this subbasin is included in the State park, and that embayment may not require any
management action. In practical terms, we may not be able to separate Eel Pond from Waquoit Bay
because so much of the Childs River nitrogen inputs end up in upper Waquoit Bay. This suggests
we should have three complimentary management districts: one for Waquoit Bay-Eel Pond, and one
each for Hamblin Pond, and Jehu Pond respectively. If we were to apply the BBP tiered limits for Waquoit Bay under this scenario, then we would need
an estimate for flushing time in the upper 1/3 of the Eel Pond-Waquoit Bay estuary complex, and
depending on flushing time, use the half-tide volume or area of that complex. Different Approach Needed
The tiered limit approach identified in the Buzzards Bay CCMP however should not be used for
Waquoit Bay. The tiered loading limits were meant to be used especially where critical impacts have
not yet occurred. Where critical impacts have already occurred, historical trends should be
evaluated, and a water quality-habitat condition "target year" should be established, and nitrogen
loading limits should be based on estimates of actual loadings entering the bay for that target-year.
In Waquoit Bay, historical trends and nitrogen loadings have already been identified, so clearly this
is the management approach that should be adopted. Identification of a water quality-resource target
year is a management decision; in a previous correspondence I suggested that 1971 was a pragmatic
choice. What was the nitrogen loading to the entire Waquoit Bay watershed in 1971? That depends on what
assumptions are made. Loadings estimated by the Buzzards Bay NEP and the Cape Cod
Commission would be fairly consistent because we use the same assumptions of loading, but our
numbers are different from those of the LMER group because they use different assumptions or the
loadings reported by Chi Ho Sham(1), who only quantified septic system loadings. From a policy and
management point of view, it is very important that the Cape Cod Commission establishes nitrogen
loading targets for Waquoit Bay that are consistent with the nitrogen loading calculations it imposes
upon applicants. Another way to state this problem is that the Commission would have to adopt the
LMER's nitrogen loading assumptions as part of its regulatory process if it were to adopt a nitrogen
loading target based on the LMER loading estimates. Since this is not practical (the Commission and BBP does not consider undeveloped land as a
nitrogen source for example), we must instead use Chi's findings to interpret our own loading
estimates. One of the most important estimates by Chi that needs to be considered is that of lag
times between nitrogen loading to the watershed and loadings to the bay. Chi's model for 1990
loadings to the watershed suggested that if development were to cease in 1990, actual loadings to
the estuary would continue to increase for many decades, although approximately 3/4 of this future
increase in nitrogen loadings would reach Waquoit Bay after only ten years because most
development is concentrated near shore or a relatively short distance from the rivers and streams
entering the bay. Another important conclusion was that 64% of the nitrogen from development that
existed in 1990 was already reaching the bay in 1990. Furthermore, nearly 90% of the watershed
loadings would reach the bay in ten years. Chi indicated that data on the actual age of each dwelling
was underestimated for some parts of the watershed, so these percent values also underestimate
actual loadings. For circa 1971, it appears from Chi's data that there are somewhat less than 2000 developed parcels
in the watershed. Using the 1971 MassGIS data and BBP GIS methodologies, the Project estimates
there were 1331 units (using the most recent drainage basin). WBNERR 1993 versions of Chi's data
files indicate 1489 units. Using this latter value and a 2.0 person per unit occupancy (this is probably
a realistic annualized occupancy rate that includes 3 months of summer intensive use of seasonal
units), and the septic system loadings and other assumptions for residential and other land uses
adopted by the CCC and BBP(2), this translates into a 33,440 kg/y watershed loading for 1971(3). In 1971, it is likely that a greater preponderance of development was clustered along shore than Chi's
1990 model uses. If we assume that approximately 75% of the nitrogen from 1971 development (as
opposed to the 64% for 1990) was already reaching the bay at that time, then a nitrogen loading
target for the entire estuary complex watershed would be 23,600 kg/y. Chi should be able to tell us
what his model predicts as the ratio of watershed to embayment loadings in that year if we need a
more precise estimate. There are two caveats with regards to the above calculations that you should consider. I used a 1993
land use file for the Waquoit Bay-Eel Pond subwatershed that is not completely consistent with land
use data for the entire watershed provided to me by Chi earlier this year. The discrepancies are
modest for the residential land use coverage, so this discrepancy may not be important. The second
issue is that we are concerned with the ground water travel times that Chi reports. In a figure in his
1994 manuscript, groundwater is traveling 6 inches per year for the upper most portion of the Childs
river watershed and during the last ten years of travel near Eel Pond still only moves 16 inches per
year (see attached figure). These estimates are half the 12 inches to 36 inches per day groundwater
travel time that is widely reported as typical for outwash plains on Cape Cod. With these higher
rates, nitrogen would be reaching Waquoit Bay about twice as fast as what Chi reports. I have
brought this issue to Chi's attention and I expect he will address this point shortly. Ignoring these two issues, if we pursue separating Waquoit Bay-Eel Pond complex from the rest of
the estuary complex, then we must repeat the 1971 calculation process for just the Waquoit Bay-Eel
Pond subbasin. I have available data from a 1993 GIS basin data for this subbasin area (which may
contain errors), and Chi's estimate of 1264 homes for the subbasins excluding Jehu, Hamblin, and sage ponds, which results in the following loadings for Waquoit Bay-Eel Pond basin: watershed
loading = 23,900 kg/y, assuming 75% is already reaching the bay then 17,900 kg/yr was reaching
the bay in 1971. Since the land area in this subbasin complex covers 3264 hectares (8064 acres), then this mass loading suggests that target loadings for the entire watershed that would achieve water quality and habitat restoration goals should be set at no more than 2.2 kg/acre (under the BBP/CCC loading assumptions) and that all new and existing development should meet this goal. Since it is unreasonable to assume all the land is developable in the watershed, and with existing open space and MMR land perhaps only 50% of the watershed land will be developed, a more rational target to achieve 1971 water quality-habitat conditions would be 4.4 kg/acre. Is such a mass loading goal achievable? A 1 acre parcel (typical nowadays) with a 5000 sq foot lawn, typical impervious surface area, and using the regional 2.0 occupancy rate contributes about 6.9 kg N/y to the watershed. If a nitrogen removal septic system were employed that had 80% nitrogen removal efficiency(4) were required, this same parcel would only contribute 2.9 kg/y, well below the 4.4 kg/y target. Retrofitting existing septic system is more problematic, but with the promulgation of the new Title 5 regulations requiring system inspection and possible cesspool replacement at time of property transfer, and with the passage of the betterment bill, the Towns of Falmouth and Mashpee could implement a program of say upgrading 50% of all cesspools in the
drainage basin over a 20 year period with N removing systems. Of course the use of N-removing alternative septic systems is not the only management option.
Others include sewering, procurement of open space, private sewage treatment facilities with
advanced N removal, reducing lawn size, to name a few other options. In addition, you may want
to do a detailed buildout analysis to project actual buildable land so that a more precise allowable
kg/acre target could be established. I hope you find this information helpful. Please note that I am ccing Chi, WBNERR, LMER
investigators and others on this communication to facilitate a review of these calculations and
exchange of ideas. Please do not hesitate to call me if you have any questions. cc.Chi Ho Sham- Cadmus Group
Maggie Giest- WBNERR
Ivan Valiela, Ken Foreman- LMER-BUMP
Jim Kremer, Glynnis Collins- LMER-USC
Rockey Geyer, WHOI waqcalc
1. In this correspondence, I use transport data from a 1994 preprint by Chi Ho Sham, J. W. Brawley, and
M. A. Moritz "Analyzing septic nitrogen loading to receiving waters: Waquoit Bay, Massachusetts" 6pp.
in the forthcoming Proceedings of the Second International Conference/Workshop on Integrating Geographic
Information Systems and Environmental Modeling, Fort Collins Colorado, 1994. It is important to recognize that Chi et al. estimate only septic system N loadings, and that their estimate for total N loading
for 4230 parcels is 18,000 kg/yr which is very close to a Buzzards Bay NEP estimate of 22,700 kg/yr assuming 2.7 kg per person per year and a 2.0 annualized occupancy rate. In fact, the difference in Chi et al.'s estimate and the one presented here may be solely due to the use of different occupancy rates.
2. Key assumptions are: 2.7 kg N per person per y, average lawn = 1.4 kg N/y, impervious lot contribution
= 0.1 kg N/y, acid rain contribution to embayment area is included in mass loading estimate to embayments, other loadings from Mass GIS coverage according to Costa et al. (1994), "Use of a Geographic Information System to estimate nitrogen loading to coastal watersheds.", BBP draft technical report March 2, 1994.
3. The revised watershed now includes a remarkably large area in the "urban Transportation" land use category, which I presume represents MMR airport area in the Quashnet basin. This category now contributes an unsettling 4,600 kg/y.
4. The 2.7 kg per person per year used by the BBP is based on 30% nitrogen removal for a conventional system. Another way to think of this n removing systems with 80% N removal efficiency is that effluent reaching groundwater must not exceed 9.1 ppm instead of the 35.0 ppm assumed for conventional systems.
