Site Index
Contact us / About Us
Bay & Watershed Info
Old CCMP|New CCMP
Links
Funding
Laws and Regulations
NEP Information
Reference
Status & Trends
Solutions
Take Action
Violations, Reporting
Weather and Tides
1999 Nitrogen Management Strategy Revisions
Related pages:
Citizen Monitoring Program |
1992 Nitrogen Action Plan
Revised Nitrogen loading standards proposed by the BBP on 10/6/99
Background
In 1990, the Buzzards Bay NEP, a participant in the U.S. Environmental Protection Agency's National Estuary
Program, developed a Total Maximum Annual Loads (TMALs) strategy to manage anthropogenic nitrogen inputs to
coastal embayments in Buzzards Bay. This strategy was contained in the 1991 Buzzards Bay Comprehensive
Conservation and Management Plan approved by the Commonwealth of Massachusetts and the US EPA.
The objective of this management strategy was to protect and restore water quality and living resources in small
coastal embayments common in Buzzards Bay and elsewhere in the region. The recommended TMAL approach to
manage point and non-point sources was empirically based on a comparison of embayment conditions to estimated
nitrogen loads, together with a synthesis of previous studies of loading and ecosystem response. Existing nitrogen
loads were based on land use data contained in a Geographic Information System, and a well defined set of nitrogen
loading assumptions for different kinds of land uses and sewage disposal. The recommended embayment TMAL
limits were established with a tiered system that incorporated existing regulatory water quality classifications,
together with embayment area or volume and hydraulic turnover time and depth, so that embayment specific
TMALs were established.
The Buzzards Bay NEP's mass loading approach and tiered system of allowable loading limits for coastal
embayments, using existing state and federal water quality classifications, has proved to be a useful management
tool. Since the Buzzards Bay CCMP was approved in 1992, the Buzzards Bay NEP, towns, and regulatory
agencies have been using this management strategy to manage impacts of growth or review discharge permits.
Recognizing that better information was needed on existing water quality in Buzzards Bay embayments, in 1992, the
Buzzards Bay NEP established, in partnership with the citizens group the Coalition for Buzzards Bay and Dr.
Brian Howes, a water quality monitoring program to evaluate nitrogen loading impacts in Buzzards Bay. The
purpose of this monitoring program was to not only document water quality conditions and trends in Buzzards Bay
embayments, but to also evaluate the appropriateness of the specific nitrogen loading limits recommended in 1991.
Recommended Changes to Management Strategy
The Buzzards Bay NEP has completed a review of seven years of the Buzzards Bay citizen's water quality
monitoring program. This information is contained in the enclosed draft final report titled "Managing
anthropogenic nitrogen inputs to coastal embayments: Technical basis and evaluation of a management strategy
adopted for Buzzards Bay" by J. E. Costa, B. L. Howes, D. Janik, D. Aubrey, E. Gunn, A. E. Giblin and dated
September, 24, 1999. This report, and various supporting data sets are being made available on the Buzzards Bay
Project's web site, www.buzzardsbay.org.
The findings in this report demonstrate that nitrogen loading limits that are based on bay flushing times and water
volumes are scientifically defensible. However, the correlation between ecosystem response and loading
characterized by the so-called "aerial scale" is weaker. In addition, the findings also suggest that the limits
proposed in 1991 appear too high to be protective for many embayments, and that lower limits may be appropriate.
Based on these observations, and additional information contained in the report, and other recent work, the
Buzzards Bay NEP is proposing the following changes to its TMAL nitrogen management strategies:
1) Abandonment of the "aerial" loading limit scale. Limits will be defined by bay volume and flushing time
alone. The Vollenweider flushing term adjustment to flushing is retained.
2) Acceptable recommended nitrogen limits (TMALs) will be reduced by as much as 50% in some
categories, and the original tiered loading table will be replaced with the following tiered loading limit
table:
Table 1. Revised nitrogen loading rate limits to coastal waters for Buzzards Bay embayments proposed by the Buzzards Bay NEP. Shallow is any embayment with an average MLW depth of 2.0 m, or having 40% or more of the bottom less than 2 m.
| Embayment type | SB Waters | SA Waters | Outstanding Resource Waters |
| Shallow | 300 mg m-3 Vr-1 | 150 mg m-3 Vr-1 | 50 mg m-3 Vr-1 |
| Deep | 400 mg m-3 Vr-1 | 200 mg m-3 Vr-1 | 75 mg m-3 Vr-1 |
3) A background loading term for precipitation to forest and other undeveloped land use types will be employed at
the rate of 0.17 kg ha-1, equivalent to a ubiquitous 2 uM DIN groundwater concentration.
4) A 30% attenuation loss term as an average for "upper" watershed loadings to account for uptake by wetlands,
streams, and ponds. The criteria for defining these areas will subsequently be issued.
5) Cranberry Bog loadings using Mass GIS land use coverage is reduced to 17.6 kg ha-1 (from 18.0) but if actual
production area is used, loading will be 24.7 kg ha-1.
The Buzzards Bay NEP's loading limits were based on a specific set of nitrogen loading assumptions for loadings
from septic systems, lawns, agricultural lands, roads, and so forth. If other loading rates for nitrogen sources are
used, then other nitrogen standards are required. Because the BBP's nitrogen loading limits take into account the
depth, flushing time, and volumes of bays, they are bay specific. Nonetheless, our approach is still a general model,
and ultimately sophisticated computer models will be developed that will take into account a more wide range of
features of bays. Until these models have been developed and refined, we believe these limits and our management
approach establishes an objective set of performance standards on which permitting decisions or new bylaws and
regulations can be based.
The Buzzards Bay NEP is a planning and technical assistance agency, not a regulatory agency. However, because
our recommended limits may have farther reaching implications for coastal management, we are inviting comments
on this report and the method changes identified in this cover letter. Comments are welcome until 5 PM Tuesday,
November 23, 1999, after which the report will be finalized, and the Buzzards Bay NEP will provide technical
and planning assistance based on these new standards.
In this table are proposed draft limits for selected Buzzards Bay embayments. Values under review and subject to
change.
| BUZZARDS BAY
EMBAYMENT
draft 10/07/99 |
selected
turnover Time (d) |
existing
loading |
WQ
Classific Goal |
NEW
TMAL limits |
%of
recomm |
| New Bedford Harbor | 26.5 | 174083 | SB | 92000 | 189% |
| Allens Pond | 3.0 | 7148 | SA | 1000 | 709% |
| Apponanset Bay | 7.4 | 31314 | SA | 15000 | 208% |
| Aucoot Cove | 0.4 | 7717 | ORW | 255000 | 3% |
| Brant Island Cove | 0.7 | 679 | ORW | 12000 | 6% |
| Buttermilk Bay | 3.4 | 23799 | ORW | 20000 | 117% |
| Clarks Cove | 1.3 | 30215 | SA | 666000 | 5% |
| Eel Pond, Mattapoisett | 1.0 | 5149 | ORW | 2000 | 247% |
| Hen Cove | 2.3 | 5961 | ORW | 3000 | 196% |
| Little Bay Fairhaven | 1.5 | 15481 | ORW | 12000 | 127% |
| Little River | 1.5 | 2608 | ORW | 5000 | 51% |
| Mattapoisett upper Harbor | 2.8 | 46007 | ORW | 54000 | 83% |
| Megansett Harbor | 1.6 | 8469 | ORW | 152000 | 6% |
| Onset Bay | 3.9 | 22487 | ORW | 21000 | 106% |
| Phinneys Harbor | 1.8 | 13034 | ORW | 89000 | 15% |
| Pocasset Harbor | 4.0 | 6790 | ORW | 9000 | 75% |
| Pocasset River | 0.9 | 8804 | ORW | 22000 | 40% |
| Quisset Harbor | 0.4 | 2511 | ORW | 64000 | 4% |
| Red Brook Harbor | 4.5 | 5713 | ORW | 9000 | 62% |
| Sippican Harbor upper harbor | 12.3 | 10555 | ORW | 5000 | 210% |
| Slocums River | 11.3 | 93541 | SA | 12000 | 770% |
| Squeteague Harbor | 0.6 | 7198 | ORW | 12000 | 59% |
| Wareham River | 5.8 | 86589 | SA | 38000 | 200% |
| Weweantic River | 4.1 | 151718 | SA | 59000 | 253% |
| West Falmouth Harbor | 2.4 | 15249 | SA | 21000 | 72% |
| Widows Cove | 0.8 | 645 | ORW | 18000 | 3% |
| Wild Harbor | 0.4 | 10919 | ORW | 40000 | 27% |
| Wings Cove | 2.0 | 2035 | ORW | 16000 | 12% |
| Westport River, East Branch | 49.7 | 135331 | SB | 19000 | 702% |
| Westport River, West Branch | 16.2 | 33595 | ORW | 22000 | 150% |
| Waquoit Bay (1990 GIS) | 5.0 | 49192 | ORW | 22000 | 221% |
